The easiest black steel doors and windows to fit into an existing commercial building are the ones made to the opening as it really is: measured on site first, then made, fitted and wet-glazed by one employed team. That’s how we work at Fabco. We survey with a 3D laser and make the frames at our works in West Sussex.
An existing opening is rarely as square as the drawing suggests, and people usually find that out the hard way, when a frame ordered from the drawing turns up on site. So measure what’s there first, have the frame made to that measurement, and have the same team fit it.
If you want a broader look at black steel doors in small commercial spaces, that’s a different brief, and we cover it in our guide to black steel doors for small commercial spaces.
- We survey existing openings with a 3D laser before anything is made.
- A project engineer sends you CAD drawings to approve.
- We make the frames at our works in West Sussex, and our own employed team fits them.
- The glass goes in on site, in a professional wet-glazing process.
- We can finish the frames in black or another RAL colour, with silicone matched to the colour.
What should you check on the existing building before you order the frames?
Walk round and check every opening yourself before anything is ordered. The building is already there, and it won’t change to suit a tidy drawing, so a new-build size is the wrong place to start. What you need is a true measurement of each opening, and a note of anything that will make it awkward.
- Make a list of every door and window that’s being replaced, and note whether each one faces the street or sits inside the building.
- Write down anything that could make an opening awkward, such as a floor that isn’t level, a lintel that isn’t straight, or a wall that’s still in daily use.
- Ask whoever is making the frames to survey those openings before they make anything. We use a 3D laser.
- Agree who will be on site for the survey, so the surveyor can get to every opening and the building can keep trading where it needs to.
- Decide on the finish early. It’s usually black, and settling it now means the new frames will sit with the rest of the elevation.
What should you write on the order so the new black steel actually fits?
The order should say that each frame is made to the surveyed opening, and then give the product, the sightline, the colour, and who fits and glazes the work. Here’s what to put down, and what we do.
- Say that each frame is to be made to the surveyed opening and not to a standard new-build size.
- Give the product and the sightline for each opening. Ours would be a steel door or steel window with 10mm sightlines.
- Give the colour, which is usually black, or whichever RAL finish you have agreed.
- Say who will fit and glaze the frames. With us, our own fitters install them and our own engineers wet-glaze them on site.
- Mark any fire-separating opening separately, so a slimmer leaf doesn’t get copied onto a wall that must hold back fire. For those openings we make W40 FD30 doors and screens, built on the Ottostumm W40 system, which is independently assessed by Warringtonfire for FD30 performance.
Existing opening: The actual hole in the wall of a building that’s already in use. It may be out of square, so it has to be measured before a new frame is made.
3D laser survey: A precise measurement of an existing opening, taken on site, so the new door or window is made to what’s there and not to a tidy drawing of what someone hoped was there.
Wet glazing: Setting the glass into the frame on site, once the frame is in, using a professional process and a colour-matched, colour-fast silicone.
How does one employed team make the integration easier?
One employed team makes the job easier because the same people measure the old opening, make the new frame, fit it and glaze it. Nothing has to be handed to a chain of subcontractors, and the fitter is working from a measurement that a colleague took. That continuity helps more than a lighter frame would. This is how it runs with us.
- Our surveyors measure the existing openings with a 3D laser.
- A project engineer draws the frames from those measurements and sends you the drawings to approve.
- We make the new frames at our West Sussex works.
- Our own fitters install the frames in the existing openings.
- Our engineers then wet-glaze them on site, with a RAL colour-matched, colour-fast silicone.
Many suppliers rely on a network of subcontracted surveyors, installers, project managers and glazing teams. We employ our own dedicated project engineers, surveyors, fitters and glazing engineers.
Who does each stage on an existing commercial building
| Stage | Who does it at Fabco | Why that helps on an existing build |
|---|---|---|
| Survey | Our employed surveyors, with a 3D laser | The frame is made to the actual opening, not to a tidy guess. |
| Drawings | Our project engineer, for your approval | You see the frame against the measured opening before we make it. |
| Making | Our works in West Sussex | The door and the window come from the same shop, in the same finish. |
| Fitting and glazing | Our own fitters and glazing engineers | The glass is set after the frame is in the old opening. |
What should you not assume when you replace frames in an existing commercial building?
Don’t assume that a new-build size will drop in, and don’t assume that the glass will already be in the frame when it arrives. Both are easy to take for granted when the programme is being written. Work from the survey, and plan for wet glazing on site.
What to assume, and what not to assume, on an existing opening
| Assumption | What to do instead |
|---|---|
| The old opening is square and true | Have it measured with a 3D laser, then make the frame to that measure. |
| The glass will arrive already in the frame | Plan for on-site wet glazing once the frame is fitted. |
| Any black steel door will do, including a fire door | Give fire-separating walls their own W40 FD30 leaf, and keep everyday openings on the standard system. |
| A different team can take over at each stage | Keep measuring, making, fitting and glazing with the same employed team. |
For looking after the frames once the building is back in use, see our aftercare guidance. The same family of finishes is available on our external doors and internal doors.
Questions people also ask
Why is a survey of the existing opening so important?
An existing commercial opening is rarely as square as a new-build drawing. A 3D laser survey captures the actual opening before anything is made, so the new frame is cut to what’s there, not to a guess. That’s the first step in a clean integration.
Are the frames glazed in the factory or on site?
On site. After the frames are fitted, our own engineers complete a professional wet-glazing process, using a RAL colour-matched, colour-fast silicone. For an existing building, that means the glass is set once the frame is already in the old opening.
Can the new frames be finished in black to match the rest of the job?
Yes. Black is a standard choice, and we also offer anthracite grey, heritage colours and bespoke RAL colours. The silicone used in the wet glazing is colour-matched and colour-fast, so the bead doesn’t fight the frame once the building is back in use.
Who should fit the new doors and windows in a live commercial building?
Choose a manufacturer that employs its own surveyors, project engineers, fitters and glazing engineers, rather than a chain of subcontractors. That’s how we work at Fabco, from the first measure through to the glazing on site. One team is what keeps the new frame true to the old opening.
Do slimmer steel frames make an old opening harder to work with?
Not if the frame is made to the measured opening. We work to 10mm sightlines, which helps a new door or window sit quietly in an older wall. The slim line is the visible width of steel, not a reason to skip a proper survey.
What to take back to the existing openings
Measure what’s there, have the frames made to those measurements, and keep the survey, the fitting and the glazing with one employed team. That’s what makes black steel easy to fit into an existing building. A frame ordered from a standard size won’t do it.
If you’d like us to do the work, walk the openings with us, agree the colour and let us survey before anything is made. The new doors and windows can then sit in the old walls as if they had always been there, with the same black finish running from the street door to the windows replaced on the same visit.